BYU Hawaii Married Student Housing

Facility
byu7

Project Information

General Contractor: Jacobsen Construction

Scope of Work

  • Cold-formed Metal Framing
  • Sheathing
  • Thermal Installation
  • Exterior Insulation and Finish System
  • Air Barrier Coating
  • Non-structural Metal Framing
  • Portland Cement Plastering
  • Gypsum Board
  • Shop Fabricated Wood Trusses
  • Plastic Laminated Face Architectural Cabinets
  • Sidings
  • Hollow Specialty Doors and Frames
  • Finish Hardware
  • Wall and Door Protection
  • Toilet, Bath and Laundry Accessories
  • Fire Extinguisher Cabinets